Supporting Documents
The Keystone methodology is openly published. Take what's useful. Adapt it to your programme. Fork it into your organisation's templates. Hand it on to a peer running an ERP programme who would benefit from it.
All files are in editable formats — Word, PowerPoint, Excel — so you can change them rather than just look at them. No sign-up required to download anything below.
Framework overview
Start here
Programme Lifecycle · Plan on a Page (POAP)
A single visual summary of the methodology — six phases, twenty stages, key milestones, parallel activity tracks, governance bodies, headline durations. Exec / senior team audience tier. The right starting point if you've heard about Keystone and want to see the whole shape in one view.
Download the POAP · PowerPoint · 78 KBOr browse the full deck set below — the POAP plus the Overall Timeline plus the five phase decks form the complete methodology in slide form.
Methodology decks
The seven core decks
The methodology is published as seven editable PowerPoint decks. Audience tiers are noted per the canonical reference — exec / senior-team summaries at the top, programme- and project-team detail in the phase decks.
Overview decks (Exec / Senior team)
- Programme Lifecycle · Plan on a Page (POAP) — single-view methodology summary
- Overall Timeline — calendar-view across the lifecycle
Phase decks (Programme / Project team)
- 1 — Pre-Programme — Stages 0–5 (exec to slide 16, programme team appendix from slide 17)
- 2 — Selection — Stages 6–9 (exec to slide 12, programme team appendix from slide 13)
- 3 — Setup & Design — Stages 10–12, programme + project team
- 4 — Build & Test — Stages 13–14, programme + project team
- 5 — Deploy & Post-Programme — Stages 15–19, with exec involvement at the cutover Go/No-Go
The artefact library
Pre-drafted templates by lifecycle phase
The philosophy behind these is on the Pre-drafted artefacts page. Workshops arrive with structured starting points, not blank pages. Take a template, populate it with your programme's specifics, sign it off.
Pre-Programme — Stages 0–5
- Problem & Opportunity Statement (Word) — Stage 0
- Vision & Strategy (Word) — Stage 1
- Enterprise AS-IS Assessment Summary (Word) with four supporting diagrams: Estate-on-a-Page (PowerPoint) · Integration-on-a-Page (PowerPoint) · Capability Heatmap (PowerPoint) · Dependency Tree (PowerPoint) — Stages 1–2
- Benefits Map and ROI Driver Matrix (Excel) — Stage 2
- Governance Terms of Reference (Word) — Stage 3 · coming soon
- RACI Matrix (Excel)
- Risk Management Plan (Word)
- Programme Charter (Word) — Stage 5
Governance packs
- Executive Sponsor Group pack (PowerPoint)
- Steering Committee pack (PowerPoint)
- Design Authority pack (PowerPoint)
Selection — Stages 6–9
- Funding Envelope (Excel) — Stage 6
- RFI Template (Word) — Stage 7
- Vendor Comparison Tier 1 vs Tier 2 (Word) — Stage 8 input
- Software Selection Scorecard (Excel) — Stage 8
Setup & Design — Stages 10–12
- Project Repository Layout (Excel) — Stage 10
- Discovery workshop pack (PowerPoint) — Stage 11 · coming soon
- Solution Design Document template (Word) — Stage 12
- FDD example: Procure-to-Pay (Word) — Stage 12
- Integration Specification example: HR to ERP (Word) — Stage 12
- Data Migration Mapping example: Customers (Excel) · Specification (Word) — Stages 11–14
Cadence & Change Control — Stage 10 onwards
- Change Request Form (Word)
- Design Decisions Log (Excel)
- Weekly Programme Status Report (Word)
- Sprint Review Pack (PowerPoint)
- RAID Log (Excel)
Build & Test — Stages 13–14
SOW Suite — Stages 9–17
- MSA Schedule (Word)
- SOW 1 — Discovery (Word)
- SOW 2 — Design (Word)
- SOW 3 — Build / Test / Deploy / Hypercare (Word) · SOW Suite Overview
Deploy — Stages 15–17
- Cutover Plan and Runbook (Excel) — Stages 15–17
- Site Readiness Checklist (Excel) — per site, multi-site programmes only — Stages 14–17
- Hypercare exit criteria checklist · coming soon
Post-Programme — Stages 18–19
Cross-cutting
- DevOps and Agile How-To Guide (PowerPoint)
- Stakeholder Map template (Excel)
- Change Impact Assessment (Excel)
- Training Tracker (Excel)
Each download link will be wired to the actual file at launch. The library is growing — new templates land as the methodology learns from each delivery.
Notify me
When new material drops
The library is growing. New templates land as the methodology learns from each delivery. If you want to hear when something new is published, leave your email — that's all it does.
No marketing emails. No newsletter. Just a note when there's new material on this page.